What is the latest installation process of the boiler currently in use?
- Categories:information centre
- Author:
- Origin:
- Time of issue:2020-10-22 17:56
- Views:
(Summary description)用户在购买锅炉后面临的会面临安装的问题一般来说,用户挑选值得信任的大型安装公司更有保障,安装公司会对阀门水管、电气设备进行安装,保证用户使用时便利、安全。
1、准备作业
在准备安装锅炉之前,要准备好安装锅炉所需的工具以及原料,并且查看这些工具和原料的数量是否足够、质量是否过关、等,并且也要把其相关的说明书或者是操作手册准备到位,以便在不了解状况时可以随时查阅。
2、水泵管道的安装
确定好安装的地点以及所需求的锅炉安装的原料,接下来进行安装作业。最好在安装之前做好方位的策划,这样才能保证安装的到位。在安装好锅炉之后,接下来安装水泵以及管道,安装好水泵好管道以后,锅炉的安装基本完成。
现在市场上的锅炉安装流程主要有以上几步,温馨提示,管道安装一般都需求安装给水、热水以及排污管道三个不同的管道。在安装时要根据说明进行安装,不可以盲目安装。
What is the latest installation process of the boiler currently in use?
(Summary description)用户在购买锅炉后面临的会面临安装的问题一般来说,用户挑选值得信任的大型安装公司更有保障,安装公司会对阀门水管、电气设备进行安装,保证用户使用时便利、安全。
1、准备作业
在准备安装锅炉之前,要准备好安装锅炉所需的工具以及原料,并且查看这些工具和原料的数量是否足够、质量是否过关、等,并且也要把其相关的说明书或者是操作手册准备到位,以便在不了解状况时可以随时查阅。
2、水泵管道的安装
确定好安装的地点以及所需求的锅炉安装的原料,接下来进行安装作业。最好在安装之前做好方位的策划,这样才能保证安装的到位。在安装好锅炉之后,接下来安装水泵以及管道,安装好水泵好管道以后,锅炉的安装基本完成。
现在市场上的锅炉安装流程主要有以上几步,温馨提示,管道安装一般都需求安装给水、热水以及排污管道三个不同的管道。在安装时要根据说明进行安装,不可以盲目安装。
- Categories:information centre
- Author:
- Origin:
- Time of issue:2020-10-22 17:56
- Views:
Users will face installation problems after purchasing a boiler. Generally speaking, it is more secure for users to choose a trusted large-scale installation company. The installation company will install valves, water pipes and electrical equipment to ensure convenience and safety for users.
1. Preparation
Before preparing to install the boiler, prepare the tools and raw materials required for the installation of the boiler, and check whether the quantity of these tools and raw materials are sufficient, whether the quality is satisfactory, etc., and the relevant instructions or operation manuals must be prepared in place. So that you can check it at any time when you don’t know the situation.
2. Installation of water pump pipeline
Determine the installation location and the required raw materials for boiler installation, and then proceed with the installation work. It is best to plan the location before installation, so as to ensure that the installation is in place. After installing the boiler, install the water pump and pipes. After installing the water pump and pipes, the boiler installation is basically completed.
Currently, the boiler installation process on the market mainly has the above steps. A warm reminder, pipeline installation generally requires the installation of three different pipelines: water supply, hot water and sewage pipelines. The installation should be carried out according to the instructions during installation, and it cannot be installed blindly.
Scan the QR code to read on your phone
contact us
Add:
Factory A5, Torch Innovation and Pioneer Park,
Luoyang High-tech Development Zone
phone: 13683868189
Fixed: 0379-64182158
Fax: 0379-64182159
Mobile version
Copyright © 2020 Luoyang Ande Road Technology Co., Ltd. All Rights Reserved. 豫ICP备2020032064号-1